Tiechang Township Photovoltaic Power Station

 Located in Mianning County, Liangshan Prefecture, the project comprises three separate sites: Sunshui, Gaolou, and Wale.  Total installed capacity: 80 MWp  Average annual energy generation: 927.13 GWh (927,130,000 kWh)  Annual global solar radiation: 5,069.7 MJ/m²  Annual sunshine duration: 1,451.4 hours  Foundation types by site:  Sunshui site: Independent spread footings under columns  Gaolou site: Helical pile foundations  Wale site: Helical pile foundations