Chongqing Yongchuan Xianlong 270 MW Agrivoltaic Project

•  an AC-side installed capacity of 270 MW and a DC-side peak capacity of up to 339.8976 MWp. •  The entire site is divided into 93 sub-arrays. Each string consists of 28 PV modules, which are connected to a 320 kW string inverter. •  Power is collected via 12 circuits of 35 kV collector lines and delivered to a newly built 220 kV booster substation, equipped with a main transformer rated at 270 MVA, providing ample capacity for future expansion. •  The project is expected to generate approximately 310 million kWh of electricity annually. •  This will result in an annual reduction of about 280,000 tons of CO₂ emissions.