Hongba Hydropower Station

•  (100 MW, in operation since 2005) •  peaking storage pond by excavation & embankment off the river channel •  low weir for diverting intermediate flow •  supplemented with tailrace water from Zhengyuan and Longyuan hydropower stations •  penstock bridge to surface powerhouse