Guwa Hydropower Station

•  (205 MW, commissioned in 2021) •  139.0 m high CFRD •  245.8 million m3 of total reservoir volume •  20.2 km long HRT conveying 87.8 m3/s of design discharge •  underground powerhouse •  ecology-flow power plant