Xiaka Booster Station 220KV Transmission

•  Located in Jiulong County, Garze Prefecture, Sichuan Province. •  Installed capacity of 130MW. •  Composed of three 63MVA 220kV transformers. •  The 220kV side features a single busbar connection, with a total of 4 incoming and outgoing lines.