Cuowa Power Transmission and Transformation

 Located in Maiwa Township, Litang County, Garze Tibetan Autonomous Prefecture, Sichuan Province.  The total installed capacity is 57MW.  The source elevation is above 4600.00 meters.  The outdoor booster station is located to the left of the main power house, with site dimensions of 42.80m × 34.10m, and a ground elevation of 3088.80m.